High loads
A High Load Permit may be required if you are moving large structures by road. Typical High Loads include houses, boats, machinery and industrial structures. When transporting any load over 4.25m high, the transporting vehicle must carry a High Load Permit from the appropriate companies in accordance with LTSA requirements.
To obtain a High Load Permit you need to download and complete the High Load Request Application form and fax to us on 0800 822 101.
Alternatively you can contact us on 0800 822 124 to request a form.
Please ensure you complete all fields on the form and sign it - note that we cannot accept any applications that haven't been signed.
Please ensure you submit your application at least two working days prior to the intended transportation date.
In most cases we are able to issue a permit within two working days of receiving the application.
Once we have received your application we will determine if an escort is required and issue a High Load Permit if approved. A copy of the Permit will be faxed to you and it must be carried by the transporting vehicle.
For Loads up to 4.25 metres high:
No Permit is required.
For Loads between 4.25 and 5.0 metres high:
No Permit required but you must have written permission from the owner of any overhead obstruction that the vehicle can't clear safely.
For Loads between 5.0 and 5.5 metres high:
We will check the proposed route and if the route is clear to the height required, a Permit will be issued. If there are low lines we arrange to escort and manage the obstruction at no
cost.
For Loads over 5.5 metres high:
We will check the proposed route and if the route is clear to the height required, a Permit will be issued. If the route is not clear we will arrange an escort and manage the obstructions for which a charge will apply.
Where an escort is required charges may be incurred. Escorts are normally charged on a time, materials and vehicle basis. Please call us on 0800 822 124 if you would like an indication of costs.
Contact details for High Load Permit
Phone: 0800 822 124
Fax: 0800 822 101
Hours of permit issue are Monday to Friday, 7:30am to 5:00pm.
Applications must be received with a minimum of two working days notice.