Category 3 build methods

If you live in a multi-dwelling unit or right-of-way, and you or one of your neighbours has ordered fibre, you will have received a consent pack from us outlining the work we need to do, including build methods, to bring fibre from the street and along your driveway or through your building. 

For category 3, the following build methods are used. 

Extensive hard surface
This includes any hard surface work (concrete or asphalt) that will cover an area greater than four square metres per dwelling on the property, longer than three metres, and covering more than 30% of the width of a driveway. This also include any occasions where multiple areas next to each other require reinstatement once the build work is complete.